Cost Breakdown
Name/Model: Swift SWF-7
Technology: Inner Sphere (Mixed)
Tonnage: 45
Configuration: Hover Combat Vehicle
======================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------------
Armor (Standard) (160 pts) 10.0 x 10,000 100,000.00
Internal Structure (Standard) 4.5 x 10,000 (+) 45,000.00 = 145,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 170,000.00
Lift/Dive Equipment 4.5 x 20,000 (+) 90,000.00 = 260,000.00
Engine (XXL) (100,000 x 125 x 45) / 75 (+) 7,500,000.00 = 7,760,000.00
Turret 1 x 5,000 (+) 5,000.00 = 7,765,000.00
----------------------------------------------------------------------------------------------------------------------
Total Structural Cost 7,765,000.00
======================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------------
AP Gauss Rifle (C) 10,000 10,000.00
AP Gauss Rifle (C) 10,000 (+) 10,000.00 = 20,000.00
AP Gauss Rifle (C) 10,000 (+) 10,000.00 = 30,000.00
AP Gauss Rifle (C) 10,000 (+) 10,000.00 = 40,000.00
AP Gauss Rifle (Ammo 40) [Empty Bin] (C) 0 (+) 0.00 = 40,000.00
MML 5 (Ammo 20) [SRM / Inferno] [Empty Bin] 0 (+) 0.00 = 40,000.00
MML 5 (Ammo 24) [LRM / Artemis IV] [Empty Bin] 0 (+) 0.00 = 40,000.00
MML 5 w/ Artemis V FCS 75,000 + 250,000 (+) 325,000.00 = 365,000.00
Plasma Cannon (C) 320,000 (+) 320,000.00 = 685,000.00
Plasma Cannon (Ammo 10) [Empty Bin] (C) 0 (+) 0.00 = 685,000.00
Vehicular Jump Jets 45 x (3 x 3) x 200 (+) 81,000.00 = 766,000.00
----------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 766,000.00
======================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------------
Structural Cost 7,765,000.00
Weapons and Equipment Cost (+) 766,000.00 = 8,531,000.00
Combat Vehicle Cost Multiplier 1 + (45 / 50) (*) 1.9 = 16,208,900.00
----------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 16,208,900.00
|