Cost Breakdown
Name/Model: X-IFV
Technology: Inner Sphere (Mixed)
Tonnage: 55
Configuration: Tracked Combat Vehicle
====================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (232 pts) 12.0 x 25,000 300,000.00
Internal Structure (Standard) 5.5 x 10,000 (+) 55,000.00 = 355,000.00
Control Components 3 x 10,000 (+) 30,000.00 = 385,000.00
Engine (XL) (20,000 x 275 x 55) / 75 (+) 4,033,333.33 = 4,418,333.33
Heat Sinks (Single) 2 x 2,000 (+) 4,000.00 = 4,422,333.33
Turret 0.5 x 5,000 (+) 2,500.00 = 4,424,833.33
--------------------------------------------------------------------------------------------------------------------
Total Structural Cost 4,424,833.33
====================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------
Active Probe (C) 200,000 200,000.00
Anti-Missile System (C) 100,000 (+) 100,000.00 = 300,000.00
Anti-Missile System (Ammo 24) [Empty Bin] (C) 0 (+) 0.00 = 300,000.00
Compartment, Battle Armor (8 ton) (C) 16 x 0 (+) 0.00 = 300,000.00
ECM Suite (C) 200,000 (+) 200,000.00 = 500,000.00
ER Large Laser (C) 200,000 (+) 200,000.00 = 700,000.00
SRM 4 (C) 60,000 (+) 60,000.00 = 760,000.00
SRM 4 (Ammo 25) [Empty Bin] (C) 0 (+) 0.00 = 760,000.00
Vehicular Jump Jets 55 x (5 x 5) x 200 (+) 275,000.00 = 1,035,000.00
--------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,035,000.00
====================================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------------------
Structural Cost 4,424,833.33
Weapons and Equipment Cost (+) 1,035,000.00 = 5,459,833.33
Combat Vehicle Cost Multiplier 1 + (55 / 100) (*) 1.55 = 8,462,741.67
--------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 8,462,742.00
|