Cost Breakdown
Name/Model: Phaëthon Heavy Assault Tank
Technology: Clan
Tonnage: 80
Configuration: Wheeled Combat Vehicle
=================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (320 pts) 17.0 x 20,000 340,000.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 420,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 460,000.00
Engine (XL) (20,000 x 380 x 80) / 75 (+) 8,106,666.67 = 8,566,666.67
Turret 1 x 5,000 (+) 5,000.00 = 8,571,666.67
-----------------------------------------------------------------------------------------------------------------
Total Structural Cost 8,571,666.67
=================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------
ATM 3 50,000 50,000.00
ATM 3 50,000 (+) 50,000.00 = 100,000.00
ATM 3 (Ammo 20) [Empty Bin] 0 (+) 0.00 = 100,000.00
ATM 3 (Ammo 20) [ER] [Empty Bin] 0 (+) 0.00 = 100,000.00
ATM 3 (Ammo 20) [HE] [Empty Bin] 0 (+) 0.00 = 100,000.00
CASE 2 x 50,000 (+) 100,000.00 = 200,000.00
Improved Heavy Medium Laser 150,000 (+) 150,000.00 = 350,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 750,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 750,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 750,000.00
-----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 750,000.00
=================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------
Structural Cost 8,571,666.67
Weapons and Equipment Cost (+) 750,000.00 = 9,321,666.67
Combat Vehicle Cost Multiplier 1 + (80 / 200) (*) 1.4 = 13,050,333.33
-----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 13,050,333.00
|