Cost Breakdown
Name/Model: Shrike 4
Technology: Clan (Mixed)
Tonnage: 95
Configuration: Biped BattleMech
===============================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (293 pts) 15.5 x 20,000 310,000.00
Internal Structure (Endo Steel): 95 x 1,600 x 1 (+) 152,000.00 = 462,000.00
Myomer (Standard): 95 x 2,000 (+) 190,000.00 = 652,000.00
Engine (XL): (20,000 x 380 x 95) / 75 (+) 9,626,666.67 = 10,278,666.67
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 11,478,666.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 11,678,666.67
Life Support: 50,000 (+) 50,000.00 = 11,728,666.67
Sensors: 95 x 2,000 (+) 190,000.00 = 11,918,666.67
Heat Sinks (Laser): 12 x 6,000 (+) 72,000.00 = 11,990,666.67
Arm Actuators: 95 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 43,700.00 = 12,034,366.67
Leg Actuators: 95 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 66,500.00 = 12,100,866.67
-------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 12,100,866.67
===============================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------------
CASE 2 x 50,000 100,000.00
Improved Jump Jets 95 x (6 x 6) x 500 (+) 1,710,000.00 = 1,810,000.00
LB 5-X AC 250,000 (+) 250,000.00 = 2,060,000.00
LB 5-X AC (Ammo 20) [Cluster] [Empty Bin] 0 (+) 0.00 = 2,060,000.00
LB 5-X AC (Ammo 20) [Empty Bin] 0 (+) 0.00 = 2,060,000.00
Partial Wing 5 x 50,000 (+) 250,000.00 = 2,310,000.00
PPC Capacitor (IS) 150,000 (+) 150,000.00 = 2,460,000.00
Snub-Nose PPC (IS) 300,000 (+) 300,000.00 = 2,760,000.00
-------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 2,760,000.00
===============================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 12,100,866.67
Weapons and Equipment Cost: (+) 2,760,000.00 = 14,860,866.67
BattleMech Cost Multiplier: 1 + (95 / 100) (*) 1.95 = 28,978,690.00
-------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 28,978,690.00
|