Cost Breakdown
Name/Model: QR Prime 2.0
Technology: Clan
Tonnage: 60
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (250 pts) 13.5 x 20,000 270,000.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 330,000.00
Control Components 3 x 10,000 (+) 30,000.00 = 360,000.00
Engine (XXL) (100,000 x 240 x 60) / 75 (+) 19,200,000.00 = 19,560,000.00
Heat Sinks (Single) 2 x 2,000 (+) 4,000.00 = 19,564,000.00
Turret 1.5 x 5,000 (+) 7,500.00 = 19,571,500.00
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 19,571,500.00
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
CASE 2 x 50,000 100,000.00
Gauss Rifle 300,000 (+) 300,000.00 = 400,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 400,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 400,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 400,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 400,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 400,000.00
Heavy Machine Gun 7,500 (+) 7,500.00 = 407,500.00
Heavy Machine Gun 7,500 (+) 7,500.00 = 415,000.00
Heavy Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 415,000.00
Laser Anti-Missile System 225,000 (+) 225,000.00 = 640,000.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 700,000.00
Targeting Computer 3 x 10,000 (+) 30,000.00 = 730,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 730,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 19,571,500.00
Weapons and Equipment Cost (+) 730,000.00 = 20,301,500.00
Combat Vehicle Cost Multiplier 1 + (60 / 100) (*) 1.6 = 32,482,400.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 32,482,400.00
|