Cost Breakdown
Name/Model: Nova Cat (CNG Nova Cat) Nova Cat M5A
Technology: Clan (Mixed)
Tonnage: 70
Configuration: Biped BattleMech
===============================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------------
Armor (Hardened): (148 pts) 18.5 x 15,000 277,500.00
Internal Structure (Endo Steel): 70 x 1,600 x 1 (+) 112,000.00 = 389,500.00
Myomer (Standard): 70 x 2,000 (+) 140,000.00 = 529,500.00
Engine (XL): (20,000 x 280 x 70) / 75 (+) 5,226,666.67 = 5,756,166.67
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 6,656,166.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 6,856,166.67
Life Support: 50,000 (+) 50,000.00 = 6,906,166.67
Sensors: 70 x 2,000 (+) 140,000.00 = 7,046,166.67
Heat Sinks (Double): 18 x 6,000 (+) 108,000.00 = 7,154,166.67
Arm Actuators: 70 x ((100 x 2) + (50 x 2) + (80 x 0)) (+) 21,000.00 = 7,175,166.67
Leg Actuators: 70 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 49,000.00 = 7,224,166.67
-------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 7,224,166.67
===============================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System 100,000 (+) 100,000.00 = 200,000.00
Anti-Missile System (Ammo 24) [Empty Bin] 0 (+) 0.00 = 200,000.00
CASE 1 x 50,000 (+) 50,000.00 = 250,000.00
Large Re-engineered Laser (IS) 250,000 (+) 250,000.00 = 500,000.00
Large Re-engineered Laser (IS) 250,000 (+) 250,000.00 = 750,000.00
Light Active Probe 150,000 (+) 150,000.00 = 900,000.00
Medium Re-engineered Laser (IS) 100,000 (+) 100,000.00 = 1,000,000.00
Medium Re-engineered Laser (IS) 100,000 (+) 100,000.00 = 1,100,000.00
Medium Re-engineered Laser (IS) 100,000 (+) 100,000.00 = 1,200,000.00
-------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,200,000.00
===============================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 7,224,166.67
Weapons and Equipment Cost: (+) 1,200,000.00 = 8,424,166.67
BattleMech Cost Multiplier: 1 + (70 / 100) (*) 1.70 = 14,321,083.33
-------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 14,321,083.00
|