Cost Breakdown
Name/Model: State Frontier WorkMech “Lifter” SFWM-30-L
Technology: Inner Sphere
Tonnage: 30
Configuration: Biped IndustrialMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Heavy Industrial): (104 pts) 6.5 x 10,000 65,000.00
Internal Structure (Industrial): 30 x 300 x 1 (+) 9,000.00 = 74,000.00
Myomer (Standard): 30 x 2,000 (+) 60,000.00 = 134,000.00
Engine (Internal Combustion): (1,250 x 90 x 30) / 75 (+) 45,000.00 = 179,000.00
Gyro (Standard): 1.0 x 300,000 (+) 300,000.00 = 479,000.00
Cockpit (Industrial w/ Adv. FCS):200,000 (+) 200,000.00 = 679,000.00
Life Support: 50,000 (+) 50,000.00 = 729,000.00
Sensors: 30 x 2,000 (+) 60,000.00 = 789,000.00
Heat Sinks (Single): 2 x 2,000 (+) 4,000.00 = 793,000.00
Arm Actuators: 30 x ((100 x 2) + (50 x 2) + (80 x 1)) (+) 11,400.00 = 804,400.00
Leg Actuators: 30 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 21,000.00 = 825,400.00
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 825,400.00
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
Cargo, Insulated (0.5 ton) 125 x 1 125.00
Cargo, Insulated (1 ton) 125 x 2 (+) 250.00 = 375.00
Lift Hoist 50,000 (+) 50,000.00 = 50,375.00
Medium Laser 40,000 (+) 40,000.00 = 90,375.00
Power Amplifier 0.5 x 20,000 (+) 10,000.00 = 100,375.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 100,375.00
=====================================================================================================================
IndustrialMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 825,400.00
Weapons and Equipment Cost: (+) 100,375.00 = 925,775.00
IndustrialMech Cost Multiplier: 1 + (30 / 400) (*) 1.08 = 995,208.13
---------------------------------------------------------------------------------------------------------------------
Final IndustrialMech Cost 995,208.00
|