Cost Breakdown
Name/Model: Schrek Laser Carrier SLC
Technology: Inner Sphere
Tonnage: 80
Configuration: Tracked Combat Vehicle
=======================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------
Armor (Standard) (216 pts) 13.5 x 10,000 135,000.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 215,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 255,000.00
Engine (Fusion) (5,000 x 240 x 80) / 75 (+) 1,280,000.00 = 1,535,000.00
Heat Sinks (Single) 18 x 2,000 (+) 36,000.00 = 1,571,000.00
Turret 2 x 5,000 (+) 10,000.00 = 1,581,000.00
-------------------------------------------------------------------------------------------------------
Total Structural Cost 1,581,000.00
=======================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------
Large Laser 100,000 100,000.00
Large Laser 100,000 (+) 100,000.00 = 200,000.00
Large Laser 100,000 (+) 100,000.00 = 300,000.00
Small Laser 11,250 (+) 11,250.00 = 311,250.00
Small Laser 11,250 (+) 11,250.00 = 322,500.00
Small Laser 11,250 (+) 11,250.00 = 333,750.00
Small Laser 11,250 (+) 11,250.00 = 345,000.00
-------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 345,000.00
=======================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------
Structural Cost 1,581,000.00
Weapons and Equipment Cost (+) 345,000.00 = 1,926,000.00
Combat Vehicle Cost Multiplier 1 + (80 / 100) (*) 1.8 = 3,466,800.00
-------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 3,466,800.00
|