Cost Breakdown
Name/Model: Potu PTU-1G
Technology: Clan (Mixed)
Tonnage: 60
Configuration: Tracked Combat Vehicle
==============================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (248 pts) 12.5 x 25,000 312,500.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 372,500.00
Control Components 3 x 10,000 (+) 30,000.00 = 402,500.00
Engine (Fusion) (5,000 x 240 x 60) / 75 (+) 960,000.00 = 1,362,500.00
Turret 1.5 x 5,000 (+) 7,500.00 = 1,370,000.00
--------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,370,000.00
==============================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------
Angel ECM Suite (IS) 750,000 750,000.00
CASE 2 x 50,000 (+) 100,000.00 = 850,000.00
Flamer 7,500 (+) 7,500.00 = 857,500.00
Flamer 7,500 (+) 7,500.00 = 865,000.00
Gauss Rifle 300,000 (+) 300,000.00 = 1,165,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,165,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,165,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,165,000.00
Light Machine Gun 5,000 (+) 5,000.00 = 1,170,000.00
Light Machine Gun 5,000 (+) 5,000.00 = 1,175,000.00
Light Machine Gun 5,000 (+) 5,000.00 = 1,180,000.00
Light Machine Gun 5,000 (+) 5,000.00 = 1,185,000.00
Light Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 1,185,000.00
--------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,185,000.00
==============================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------------
Structural Cost 1,370,000.00
Weapons and Equipment Cost (+) 1,185,000.00 = 2,555,000.00
Combat Vehicle Cost Multiplier 1 + (60 / 100) (*) 1.6 = 4,088,000.00
--------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 4,088,000.00
|