Cost Breakdown
Name/Model: Grant Mk. I
Technology: Inner Sphere
Tonnage: 60
Configuration: Wheeled Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Standard) (140 pts) 9.0 x 10,000 90,000.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 150,000.00
Control Components 3 x 10,000 (+) 30,000.00 = 180,000.00
Engine (Fuel Cell) (3,500 x 220 x 60) / 75 (+) 616,000.00 = 796,000.00
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 798,000.00
Turret 2.5 x 5,000 (+) 12,500.00 = 810,500.00
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 810,500.00
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
LB 10-X AC 400,000 400,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 800,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 800,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 800,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 800,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 800,000.00
Machine Gun 5,000 (+) 5,000.00 = 805,000.00
Machine Gun 5,000 (+) 5,000.00 = 810,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 810,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 810,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 810,500.00
Weapons and Equipment Cost (+) 810,000.00 = 1,620,500.00
Combat Vehicle Cost Multiplier 1 + (60 / 200) (*) 1.3 = 2,106,650.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,106,650.00
|