Cost Breakdown
Name/Model: T-55 Medium Tank
Technology: Inner Sphere
Tonnage: 36
Configuration: Tracked Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Standard) (160 pts) 10.0 x 10,000 100,000.00
Internal Structure (Standard) 4.0 x 10,000 (+) 40,000.00 = 140,000.00
Control Components 2 x 10,000 (+) 20,000.00 = 160,000.00
Engine (Internal Combustion) (1,250 x 110 x 36) / 75 (+) 66,000.00 = 226,000.00
Turret 1 x 5,000 (+) 5,000.00 = 231,000.00
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 231,000.00
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
Chassis Modification, Limited Amphibious 1.5 x 10,000 (+) 15,000.00 = 115,000.00
Extended Fuel Tank 0 (+) 0.00 = 115,000.00
Machine Gun 5,000 (+) 5,000.00 = 120,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 120,000.00
Medium Rifle 75,500 (+) 75,500.00 = 195,500.00
Medium Rifle (Ammo 9) [Empty Bin] 0 (+) 0.00 = 195,500.00
Medium Rifle (Ammo 9) [Empty Bin] 0 (+) 0.00 = 195,500.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 195,500.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 231,000.00
Weapons and Equipment Cost (+) 195,500.00 = 426,500.00
Combat Vehicle Cost Multiplier 1 + (36 / 100) (*) 1.36 = 580,040.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 580,040.00
|