Cost Breakdown
Name/Model: Bennu Airspace Control Platform ACP-BNU-011
Technology: Inner Sphere
Tonnage: 75
Configuration: Wheeled Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (152 pts) 8.5 x 20,000 170,000.00
Internal Structure (Standard) 7.5 x 10,000 (+) 75,000.00 = 245,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 285,000.00
Engine (Light Fusion) (15,000 x 205 x 75) / 75 (+) 3,075,000.00 = 3,360,000.00
Heat Sinks (Single) 9 x 2,000 (+) 18,000.00 = 3,378,000.00
Front Turret 0.5 x 5,000 (+) 2,500.00 = 3,380,500.00
Rear Turret 2 x 5,000 (+) 10,000.00 = 3,390,500.00
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 3,390,500.00
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
Anti-Personnel Pod 1,500 1,500.00
Anti-Personnel Pod 1,500 (+) 1,500.00 = 3,000.00
Anti-Personnel Pod 1,500 (+) 1,500.00 = 4,500.00
Anti-Personnel Pod 1,500 (+) 1,500.00 = 6,000.00
Beagle Active Probe 200,000 (+) 200,000.00 = 206,000.00
C3 Slave 250,000 (+) 250,000.00 = 456,000.00
CASE 50,000 (+) 50,000.00 = 506,000.00
Enhanced LRM 20 312,500 (+) 312,500.00 = 818,500.00
Enhanced LRM 20 (Ammo 6) [Empty Bin] 0 (+) 0.00 = 818,500.00
Enhanced LRM 20 (Ammo 6) [Empty Bin] 0 (+) 0.00 = 818,500.00
Laser Anti-Missile System 225,000 (+) 225,000.00 = 1,043,500.00
Light Machine Gun 5,000 (+) 5,000.00 = 1,048,500.00
Light Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 1,048,500.00
Medium X-Pulse Laser 110,000 (+) 110,000.00 = 1,158,500.00
Medium X-Pulse Laser 110,000 (+) 110,000.00 = 1,268,500.00
Thunderbolt 5 50,000 (+) 50,000.00 = 1,318,500.00
Thunderbolt 5 50,000 (+) 50,000.00 = 1,368,500.00
Thunderbolt 5 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,368,500.00
Thunderbolt 5 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,368,500.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,368,500.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 3,390,500.00
Weapons and Equipment Cost (+) 1,368,500.00 = 4,759,000.00
Combat Vehicle Cost Multiplier 1 + (75 / 200) (*) 1.375 = 6,543,625.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 6,543,625.00
|