Cost Breakdown
Name/Model: Parxana (Tick) Point Defense terradyne MTD-452
Technology: Inner Sphere (Mixed)
Tonnage: 40
Configuration: Tracked Combat Vehicle
==========================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------
Armor (Standard) (128 pts) 8.0 x 10,000 80,000.00
Internal Structure (Standard) 4.0 x 10,000 (+) 40,000.00 = 120,000.00
Control Components 2 x 10,000 (+) 20,000.00 = 140,000.00
Engine (XL) (20,000 x 200 x 40) / 75 (+) 2,133,333.33 = 2,273,333.33
Turret 1 x 5,000 (+) 5,000.00 = 2,278,333.33
----------------------------------------------------------------------------------------------------------
Total Structural Cost 2,278,333.33
==========================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------
Bulldozer (C) 50,000 50,000.00
ER Small Laser (C) 11,250 (+) 11,250.00 = 61,250.00
ER Small Laser (C) 11,250 (+) 11,250.00 = 72,500.00
LB 5-X AC (C) 250,000 (+) 250,000.00 = 322,500.00
LB 5-X AC (Ammo 20) [Empty Bin] (C) 0 (+) 0.00 = 322,500.00
LB 5-X AC (Ammo 20) [Empty Bin] (C) 0 (+) 0.00 = 322,500.00
LB 5-X AC (Ammo 20) [Empty Bin] (C) 0 (+) 0.00 = 322,500.00
LB 5-X AC (Ammo 20) [Empty Bin] (C) 0 (+) 0.00 = 322,500.00
Micro Pulse Laser (C) 12,500 (+) 12,500.00 = 335,000.00
Micro Pulse Laser (C) 12,500 (+) 12,500.00 = 347,500.00
Targeting Computer 3 x 10,000 (+) 30,000.00 = 377,500.00
----------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 377,500.00
==========================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------
Structural Cost 2,278,333.33
Weapons and Equipment Cost (+) 377,500.00 = 2,655,833.33
Combat Vehicle Cost Multiplier 1 + (40 / 100) (*) 1.4 = 3,718,166.67
----------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 3,718,167.00
|