Cost Breakdown
Name/Model: “StackBack” M-40 Mining Mech
Technology: Inner Sphere
Tonnage: 60
Configuration: Biped IndustrialMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Heavy Industrial): (144 pts) 9.0 x 10,000 90,000.00
Internal Structure (Industrial): 60 x 300 x 1 (+) 18,000.00 = 108,000.00
Myomer (Standard): 60 x 2,000 (+) 120,000.00 = 228,000.00
Engine (Fission): (7,500 x 180 x 60) / 75 (+) 1,080,000.00 = 1,308,000.00
Gyro (Standard): 2.0 x 300,000 (+) 600,000.00 = 1,908,000.00
Cockpit (Industrial w/ Adv. FCS):200,000 (+) 200,000.00 = 2,108,000.00
Life Support: 50,000 (+) 50,000.00 = 2,158,000.00
Sensors: 60 x 2,000 (+) 120,000.00 = 2,278,000.00
Heat Sinks (Single): 5 x 2,000 (+) 10,000.00 = 2,288,000.00
Arm Actuators: 60 x ((100 x 2) + (50 x 2) + (80 x 0)) (+) 18,000.00 = 2,306,000.00
Leg Actuators: 60 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 42,000.00 = 2,348,000.00
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 2,348,000.00
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
Ejection Seat 25,000 25,000.00
Flamer 7,500 (+) 7,500.00 = 32,500.00
Lift Hoist 50,000 (+) 50,000.00 = 82,500.00
Mining Drill 100,000 (+) 100,000.00 = 182,500.00
Rock Cutter 100,000 (+) 100,000.00 = 282,500.00
SRM 2 10,000 (+) 10,000.00 = 292,500.00
SRM 2 10,000 (+) 10,000.00 = 302,500.00
SRM 2 (Ammo 50) [Empty Bin] 0 (+) 0.00 = 302,500.00
Tracks (500 x 180 x 60) / 75 (+) 72,000.00 = 374,500.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 374,500.00
=====================================================================================================================
IndustrialMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 2,348,000.00
Weapons and Equipment Cost: (+) 374,500.00 = 2,722,500.00
IndustrialMech Cost Multiplier: 1 + (60 / 400) (*) 1.15 = 3,130,875.00
---------------------------------------------------------------------------------------------------------------------
Final IndustrialMech Cost 3,130,875.00
|