Cost Breakdown
Name/Model: Gauss Rifle Motor Carriage T95
Technology: Inner Sphere
Tonnage: 90
Configuration: Tracked Combat Vehicle
=============================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (347 pts) 17.5 x 25,000 437,500.00
Internal Structure (Standard) 9.0 x 10,000 (+) 90,000.00 = 527,500.00
Control Components 4.5 x 10,000 (+) 45,000.00 = 572,500.00
Engine (XL) (20,000 x 270 x 90) / 75 (+) 6,480,000.00 = 7,052,500.00
Turret 1 x 5,000 (+) 5,000.00 = 7,057,500.00
-------------------------------------------------------------------------------------------------------------
Total Structural Cost 7,057,500.00
=============================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------
Armored Motive System 13.5 x 100,000 1,350,000.00
Heavy Gauss Rifle 500,000 (+) 500,000.00 = 1,850,000.00
Heavy Gauss Rifle (Ammo 4) [Empty Bin] 0 (+) 0.00 = 1,850,000.00
Heavy Gauss Rifle (Ammo 4) [Empty Bin] 0 (+) 0.00 = 1,850,000.00
Heavy Gauss Rifle (Ammo 4) [Empty Bin] 0 (+) 0.00 = 1,850,000.00
Heavy Gauss Rifle (Ammo 4) [Empty Bin] 0 (+) 0.00 = 1,850,000.00
Rotary AC/2 175,000 (+) 175,000.00 = 2,025,000.00
Rotary AC/2 (Ammo 45) [Empty Bin] 0 (+) 0.00 = 2,025,000.00
Rotary AC/2 (Ammo 45) [Empty Bin] 0 (+) 0.00 = 2,025,000.00
Small Pulse Laser 16,000 (+) 16,000.00 = 2,041,000.00
-------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 2,041,000.00
=============================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------------
Structural Cost 7,057,500.00
Weapons and Equipment Cost (+) 2,041,000.00 = 9,098,500.00
Combat Vehicle Cost Multiplier 1 + (90 / 100) (*) 1.9 = 17,287,150.00
-------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 17,287,150.00
|