Cost Breakdown
Name/Model: Harasser AFV
Technology: Inner Sphere
Tonnage: 30
Configuration: Hover Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Standard) (80 pts) 5.0 x 10,000 50,000.00
Internal Structure (Standard) 3.0 x 10,000 (+) 30,000.00 = 80,000.00
Control Components 1.5 x 10,000 (+) 15,000.00 = 95,000.00
Lift/Dive Equipment 3 x 20,000 (+) 60,000.00 = 155,000.00
Engine (Fuel Cell) (3,500 x 110 x 30) / 75 (+) 154,000.00 = 309,000.00
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 311,000.00
Turret 1 x 5,000 (+) 5,000.00 = 316,000.00
Power Amplifiers 0.5 x 20,000 (+) 10,000.00 = 326,000.00
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 326,000.00
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
LRM 10 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 50,000.00
LRM 10 w/ Artemis IV FCS 100,000 + 100,000 (+) 200,000.00 = 250,000.00
MagShot Gauss Rifle 8,500 (+) 8,500.00 = 258,500.00
MagShot Gauss Rifle 8,500 (+) 8,500.00 = 267,000.00
MagShot Gauss Rifle (Ammo 50) [Empty Bin] 0 (+) 0.00 = 267,000.00
Small Laser 11,250 (+) 11,250.00 = 278,250.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 278,250.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 326,000.00
Weapons and Equipment Cost (+) 278,250.00 = 604,250.00
Combat Vehicle Cost Multiplier 1 + (30 / 50) (*) 1.6 = 966,800.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 966,800.00
|