Cost Breakdown
Name/Model: Saratoga Land Cruiser
Technology: Inner Sphere
Tonnage: 80
Configuration: Wheeled Combat Vehicle
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Standard) (162 pts) 10.5 x 10,000 105,000.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 185,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 225,000.00
Engine (XL) (20,000 x 380 x 80) / 75 (+) 8,106,666.67 = 8,331,666.67
Turret 2 x 5,000 (+) 10,000.00 = 8,341,666.67
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost 8,341,666.67
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
Angel ECM Suite 750,000 750,000.00
Anti-Missile System 100,000 (+) 100,000.00 = 850,000.00
Anti-Missile System 100,000 (+) 100,000.00 = 950,000.00
Anti-Missile System 100,000 (+) 100,000.00 = 1,050,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,050,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,050,000.00
Medium Laser 40,000 (+) 40,000.00 = 1,090,000.00
Medium Laser 40,000 (+) 40,000.00 = 1,130,000.00
Silver Bullet Gauss Rifle 350,000 (+) 350,000.00 = 1,480,000.00
Silver Bullet Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,480,000.00
Silver Bullet Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,480,000.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,480,000.00
=====================================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost 8,341,666.67
Weapons and Equipment Cost (+) 1,480,000.00 = 9,821,666.67
Combat Vehicle Cost Multiplier 1 + (80 / 200) (*) 1.4 = 13,750,333.33
---------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 13,750,333.00
|