Cost Breakdown
Name/Model: Schrek PPC/Gauss Carrier (XL)
Technology: Clan
Tonnage: 80
Configuration: Tracked Combat Vehicle
========================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (120 pts) 6.5 x 20,000 130,000.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 210,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 250,000.00
Engine (XL) (20,000 x 320 x 80) / 75 (+) 6,826,666.67 = 7,076,666.67
Heat Sinks (Single) 5 x 2,000 (+) 10,000.00 = 7,086,666.67
Turret 3.5 x 5,000 (+) 17,500.00 = 7,104,166.67
--------------------------------------------------------------------------------------------------------
Total Structural Cost 7,104,166.67
========================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------
CASE 2 x 50,000 100,000.00
ER PPC 300,000 (+) 300,000.00 = 400,000.00
Gauss Rifle 300,000 (+) 300,000.00 = 700,000.00
Gauss Rifle 300,000 (+) 300,000.00 = 1,000,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,000,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,000,000.00
LRM 10 100,000 (+) 100,000.00 = 1,100,000.00
LRM 10 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,100,000.00
--------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,100,000.00
========================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------
Structural Cost 7,104,166.67
Weapons and Equipment Cost (+) 1,100,000.00 = 8,204,166.67
Combat Vehicle Cost Multiplier 1 + (80 / 100) (*) 1.8 = 14,767,500.00
--------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 14,767,500.00
|