Cost Breakdown
Name/Model: Schrek II PPC Carrier
Technology: Inner Sphere
Tonnage: 85
Configuration: Tracked Combat Vehicle
=================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (158 pts) 8.0 x 25,000 200,000.00
Internal Structure (Standard) 8.5 x 10,000 (+) 85,000.00 = 285,000.00
Control Components 4.5 x 10,000 (+) 45,000.00 = 330,000.00
Engine (XL) (20,000 x 255 x 85) / 75 (+) 5,780,000.00 = 6,110,000.00
Heat Sinks (Single) 20 x 2,000 (+) 40,000.00 = 6,150,000.00
Turret 3 x 5,000 (+) 15,000.00 = 6,165,000.00
-----------------------------------------------------------------------------------------------------------------
Total Structural Cost 6,165,000.00
=================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------
LB 10-X AC 400,000 400,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 400,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 400,000.00
Snub-Nose PPC 300,000 (+) 300,000.00 = 700,000.00
Snub-Nose PPC 300,000 (+) 300,000.00 = 1,000,000.00
Snub-Nose PPC 300,000 (+) 300,000.00 = 1,300,000.00
-----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,300,000.00
=================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------
Structural Cost 6,165,000.00
Weapons and Equipment Cost (+) 1,300,000.00 = 7,465,000.00
Combat Vehicle Cost Multiplier 1 + (85 / 100) (*) 1.85 = 13,810,250.00
-----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 13,810,250.00
|