Cost Breakdown
Name/Model: Shredder turret
Technology: Inner Sphere
Tonnage: 50
Configuration: Tracked Combat Vehicle
==============================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------
Armor (Standard) (112 pts) 7.0 x 10,000 70,000.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 120,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 145,000.00
Engine (Fusion) (5,000 x 50 x 50) / 75 (+) 166,666.67 = 311,666.67
--------------------------------------------------------------------------------------------------------------
Total Structural Cost 311,666.67
==============================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------
LB 20-X AC 600,000 600,000.00
LB 20-X AC 600,000 (+) 600,000.00 = 1,200,000.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,200,000.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,200,000.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 1,200,000.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 1,200,000.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 1,200,000.00
--------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,200,000.00
==============================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------------
Structural Cost 311,666.67
Weapons and Equipment Cost (+) 1,200,000.00 = 1,511,666.67
Combat Vehicle Cost Multiplier 1 + (50 / 100) (*) 1.5 = 2,267,500.00
--------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,267,500.00
|