Cost Breakdown
Name/Model: Meteor MT-30R
Technology: Inner Sphere
Tonnage: 70
Configuration: Biped BattleMech
========================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (206 pts) 11.5 x 20,000 230,000.00
Internal Structure (Standard): 70 x 400 x 1 (+) 28,000.00 = 258,000.00
Myomer (Standard): 70 x 2,000 (+) 140,000.00 = 398,000.00
Engine (XL): (20,000 x 280 x 70) / 75 (+) 5,226,666.67 = 5,624,666.67
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 6,524,666.67
Cockpit (Small): (Armored) 175,000 + (1 x 150,000) (+) 325,000.00 = 6,849,666.67
Life Support: 50,000 (+) 50,000.00 = 6,899,666.67
Sensors: 70 x 2,000 (+) 140,000.00 = 7,039,666.67
Heat Sinks (Double): 13 x 6,000 (+) 78,000.00 = 7,117,666.67
Arm Actuators: 70 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 32,200.00 = 7,149,866.67
Leg Actuators: 70 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 49,000.00 = 7,198,866.67
------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 7,198,866.67
========================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------------
Coolant Pod 50,000 50,000.00
ER Small Laser 11,250 (+) 11,250.00 = 61,250.00
ER Small Laser 11,250 (+) 11,250.00 = 72,500.00
ER Small Laser 11,250 (+) 11,250.00 = 83,750.00
Heavy PPC 250,000 (+) 250,000.00 = 333,750.00
Heavy PPC 250,000 (+) 250,000.00 = 583,750.00
Jump Jets 70 x (4 x 4) x 200 (+) 224,000.00 = 807,750.00
Streak SRM 4 90,000 (+) 90,000.00 = 897,750.00
Streak SRM 4 90,000 (+) 90,000.00 = 987,750.00
Streak SRM 4 (Ammo 25) [Empty Bin] 0 (+) 0.00 = 987,750.00
Streak SRM 4 (Ammo 25) [Empty Bin] 0 (+) 0.00 = 987,750.00
------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 987,750.00
========================================================================================================================
BattleMech Cost
------------------------------------------------------------------------------------------------------------------------
Structural Cost: 7,198,866.67
Weapons and Equipment Cost: (+) 987,750.00 = 8,186,616.67
BattleMech Cost Multiplier: 1 + (70 / 100) (*) 1.70 = 13,917,248.33
------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 13,917,248.00
|