Cost Breakdown
Name/Model: Pike Support Vehicle (SO) "Space Olympics"
Technology: Inner Sphere
Tonnage: 60
Configuration: Tracked Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (138 pts) 7.0 x 25,000 175,000.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 235,000.00
Control Components 3 x 10,000 (+) 30,000.00 = 265,000.00
Engine (Fuel Cell) (3,500 x 180 x 60) / 75 (+) 504,000.00 = 769,000.00
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 771,000.00
Turret 2.5 x 5,000 (+) 12,500.00 = 783,500.00
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 783,500.00
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
HarJel 120,000 (+) 120,000.00 = 370,000.00
HarJel 120,000 (+) 120,000.00 = 490,000.00
MagShot Gauss Rifle 8,500 (+) 8,500.00 = 498,500.00
MagShot Gauss Rifle 8,500 (+) 8,500.00 = 507,000.00
MagShot Gauss Rifle (Ammo 50) [Empty Bin] 0 (+) 0.00 = 507,000.00
Ultra AC/2 120,000 (+) 120,000.00 = 627,000.00
Ultra AC/2 120,000 (+) 120,000.00 = 747,000.00
Ultra AC/2 120,000 (+) 120,000.00 = 867,000.00
Ultra AC/2 (Ammo 45) [Empty Bin] 0 (+) 0.00 = 867,000.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 867,000.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 783,500.00
Weapons and Equipment Cost (+) 867,000.00 = 1,650,500.00
Combat Vehicle Cost Multiplier 1 + (60 / 100) (*) 1.6 = 2,640,800.00
Environmental Sealing 2,640,800.00 x 0.25 (+) 660,200.00 = 3,301,000.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 3,301,000.00
|