Cost Breakdown
Name/Model: Patton Tank (SO) "SPACE OLYMPICS"
Technology: Inner Sphere
Tonnage: 65
Configuration: Tracked Combat Vehicle
=================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (238 pts) 12.0 x 25,000 300,000.00
Internal Structure (Standard) 6.5 x 10,000 (+) 65,000.00 = 365,000.00
Control Components 3.5 x 10,000 (+) 35,000.00 = 400,000.00
Engine (XL) (20,000 x 260 x 65) / 75 (+) 4,506,666.67 = 4,906,666.67
Turret 1.5 x 5,000 (+) 7,500.00 = 4,914,166.67
-----------------------------------------------------------------------------------------------------------------
Total Structural Cost 4,914,166.67
=================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------
C3 Boosted Slave 500,000 500,000.00
CASE 50,000 (+) 50,000.00 = 550,000.00
ER Flamer 15,000 (+) 15,000.00 = 565,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 965,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 965,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 965,000.00
Medium X-Pulse Laser 110,000 (+) 110,000.00 = 1,075,000.00
MML 5 75,000 (+) 75,000.00 = 1,150,000.00
MML 5 (Ammo 20) [SRM] [Empty Bin] 0 (+) 0.00 = 1,150,000.00
MML 5 (Ammo 24) [LRM] [Empty Bin] 0 (+) 0.00 = 1,150,000.00
-----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,150,000.00
=================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------
Structural Cost 4,914,166.67
Weapons and Equipment Cost (+) 1,150,000.00 = 6,064,166.67
Combat Vehicle Cost Multiplier 1 + (65 / 100) (*) 1.65 = 10,005,875.00
Environmental Sealing 10,005,875.00 x 0.25 (+) 2,501,468.75 = 12,507,343.75
-----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 12,507,344.00
|